Gold Member Since 2007
Audited Supplier
Suzhou Rainbow Environmental Equipment Co., Ltd.

Carbon Bend, Carbon Steel Elbow, Heater manufacturer / supplier in China, offering Ce Carbon Steel Circular Bend with Door Chimney, Stainless Steel Chimney Tee with Cover, Tee with Cap/Cover for Fireplace Chimney and so on.

(/ )

Supplier Homepage Product single wall cast iron Ce Carbon Steel Circular Bend with Door Chimney

Ce Carbon Steel Circular Bend with Door Chimney

FOB Price: Get Latest Price
Min. Order: 200 Pieces
Port: Shanghai, China
Production Capacity: 30000/Month
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Product Catalog
carbon steel
13 Products
Content
Product Image
Product Name
FOB Price
Port
Basic Info
  • Model NO.: carbon steel
  • Technique: Cold Drawn
  • Surface Treatment: Varnishing
  • Section Shape: Round
  • Transport Package: Plastic+ Paper Carton +Pallet
  • Origin: Suzhou
  • Type: Welded
  • Material: Carbon Steel
  • Usage: Oil/Gas Drilling, Firepalce ,Chimney
  • Trademark: rainbow
  • Specification: 5"6"7"8" 10" 12"
  • HS Code: 73269090
Product Description
Product description
Product name Carbon Steel Circular Bend with Door
Material Carbon Steel
certificateCE,
Size5", 6", 7", 8", 10", 12"

Advantages
The main character of this product is twist-locking connection, and it is convenient to connect three products, and it is fit for user to install and replace the product, and it without the problem of condensation.

Application
Wood fireplaces, pellet fireplaces, stove, boiler, generator, heater chimney

Product Picture
Ce Carbon Steel Circular Bend with Door Chimney

More Products
Ce Carbon Steel Circular Bend with Door Chimney
Our workshop
Ce Carbon Steel Circular Bend with Door Chimney
Our Machinery
Ce Carbon Steel Circular Bend with Door Chimney
Our Company

Ce Carbon Steel Circular Bend with Door Chimney

Our certifications

Ce Carbon Steel Circular Bend with Door Chimney

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally speaking one container needs 35~40 days for delivery.

Q: What is your terms of payment ?

A:  T/T or L/C. 
If you have another question, pls feel free to contact us as below:

Send your message to this supplier
Avatar
Ms. Molly
Manager
*From:
To: Ms. Molly
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category