Function: | Hot Water Boiler |
---|---|
Fuel: | Wood Boiler |
Installation: | Assembled Boiler |
Structure: | Gas Tube |
Media: | Organic Heat Transfer Material |
Water Circulation: | Natural Circulation |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Product Name | Rain cap |
Material | SUS304 |
Color | stainless steel colour, color painted or powder coated, can be customized |
Standard | EN 1856-1, UL103 |
Certificate | CE, UL103 |
Used | Exclude rain and leaves and a lower skirt to deflect wind for a proper chimney draft.,Wind-proof, bird resistance, attractive out-looking and corrosion resistant. |
A: We are factory.
A: Generally speaking one container needs 35~40 days for delivery.
A: T/T or L/C.
If you have another question, pls feel free to contact us as below:
Suppliers with verified business licenses